Overarching requirements

Embellishments should be designed/selected and installed as follows:

  1. Fit for purpose, appropriately positioned and accessible.
  2. Durable, robust and safe (suitable for corrosive environments).
  3. Vandal resistant with parts that are easily replaceable. 
  4. Easy to maintain (with appropriate warranty and workmanship).
  5. Comply with relevant standards, legislation, corporate documents and approvals

Planning, design and positioning     

  • Located in road reserves, parks, sportsfields or other council controlled land
  • Irrigation/valve boxes installed away from main playing surfaces (sports grounds)
  • Ensure components and fixings are flush with finished surface
  • Irrigation should be designed in such a way that irrigation coverage is consistent and effective
  • The use of water should be as such as to avoid waste/runoff
  • Compatible with Smart Irrigation Control System
  • Where appropriate, opportunities for the use of recycled water should be considered (must meet legislative requirements). 


Landscape irrigation requirements

  • Design – to suit site conditions. Requires professional interpretation and judgement by a certified irrigation designer. Where works incorporate recycled water, the certified irrigation designer must provide proof of previous experience and understanding of current guidelines
  • Design – must leave existing watercourses in their natural state
  • Design – minimise over-spray to paths and seating areas
  • (A) Non-drinking water – preferred (captured rainwater, storm water runoff and/or recycled water) Where non-drinking water is used, appropriate piping and signage must be used
  • (B) Mains water supply – metered supply. Must be registered with Unity Water
  • (C) Backflow device – required between mains supply and irrigation system. The RPZ should be located after any drinking water infrastructure, as close to the irrigation line as possible
  • (D) Irrigation control system – waterproof housing, battery backup
  • (E) Pipework – high, medium or low density polyethylene (HDPE, MDPE or LDPE) dependent of site conditions
  • (F) Valves – manual and/or automatic. Where specified, valve boxes to be lockable
  • (G) Emitters – spray and/drip emitters
  • Fittings – threaded poly risers, articulated poly risers, poly elbows and or bands
  • Wire and cable – multi-core irrigation cable, DBR/DBY (direct bury) wire joiners
  • Electrical supply – house in irrigation controller enclosure, 240V mains power and run on a 24V system

Note:   Further guidance and clarification of the content on this page, can be found in the relevant sections of this information sheet.

Page payload data

This component is currently in development

 

Sunshine Coast Open Space Landscape Infrastructure Manual (LIM) DISCLAIMER

Disclaimer

Information contained in this document may change without notice and you should use the current material available from Council’s website and not rely on material previously printed or stored by you.

All figures and diagrams are intended to be used as an aid to design and include Council’s preferred elements but they are not intended to be prescriptive and may need to be varied as dictated by site specific factors. While Council has exercised reasonable care in preparing this document, it does not warrant or represent that it is accurate or complete. The Council will not accept responsibility for any loss, damage, cost or expense that you may incur as a result of the use of or reliance upon any material contained in this document.

This document is produced to convey general information and is not intended to constitute advice whether professional or legal. Any reference to legislation in this document is not an interpretation of the law. It is to be used as a guide only. Consult relevant authority websites for current documents, revisions and amendments.

Where a particular product or supplier is profiled in this document, Council is NOT nominating this product or supplier as the selected choice. Product/supplier information has been provided to allow users to source products which contain the correct elements required for Council embellishments. Each product profiled states ‘or equivalent’ which means that different products may be supplied provided they satisfy the identified performance criteria, recommended standards, equal access guidance and product specifications.

Product design, manufacture and installation requires appropriately qualified people to provide site specific solutions to ensure the embellishment is appropriately adapted to local conditions and data.

This document does not override requirements stipulated in a development approval. Project specific variations may be appropriate as a result of site, environmental or other constraints. Any variations to these standards must be approved in writing by council prior to commencement of variation works. Components of this document may be used within a contract document but users should undertake their own investigations to confirm the information is suitable for this purpose.

Drawings contained in this document are NOT FOR CONSTRUCTION.

Details in this document are deemed to be the minimum standard and the user may wish to apply a higher standard subject to approval by council.

Acknowledgements

Council wishes to thank all contributors and stakeholders involved in the development of this document.

Copyright

Sunshine Coast Regional Council (Council) supports and encourages the distribution of its material however, copyright protects this document. Council has no objection to this material being reproduced but only if council is recognised as the owner of the copyright and this material remains unaltered.

https://www.sunshinecoast.qld.gov.au[email protected]07 5475 7272

Sunshine Coast Open Space Landscape Infrastructure Manual (LIM)

 | 

© LIM 2024 – 2026

 | 

Version 0.0.38.beta

 | 

Last Updated: 01/04/2026 12:27 AM

Preview